INCHEON NEWPORT 1-2 – Korea
The Incheon New Port 1-2 project ran between 2021 to 2023. The production of the caissons was carried out using our slipform gantry and transfer system. Transfer operations, including an impressive support tower construction anchored to the caisson. The protruding balcony shape of the caisson clearly demonstrates the flexibility of our slipform and transfer system.
Scope of work:
Gantry Slipform + IP-CCV Skidding System
Total
number of caissons:
42
Construction period:
2021-2023