In 1965, the company was granted a patent for a slipform system for conical structures “The Svetho System”. The development of the method took place in collaboration with the Hungarian state construction company ÁÉV 31.
Prescribed changes to design parameters, such as diameter and wall thickness, are checked in all units simultaneously.