Revolutionary method for constructing cisterns and steel tanks

During the 1960s, our method for steel tank construction was developed. The principles of the method are that the steel tank is built from top to bottom, all at foundation level. The steel tank is lifted in stages using our climbing jacks (2510-series) mounted on lifting trestles, positioned inside and along the circular wall.

Related Posts