Incheon International Passenger Port, Korea (Sub-Slipform Gantry)

INCHEON INTERNATIONAL PASSENGER PORT – Korea

The Incheon New Port 1-2 project ran between 2013 to 2014. The production of the caissons was carried out using our gantry slipform and transfer system.

Location:
Incheon, Korea

Caisson
weight:  

8 750 tons

Scope of work:
Gantry Slipform + IP-CCV Skidding System

Total
number of caissons:

31

Construction period:
2013-2014