Incremental launching of Enånger steel bridge
The concept was that on-shore mounted strand jacks pulled the bridge over sliding bearings that were positioned on the bridge pillars. When the bridge reached its final position, it was lifted at each pillar, and the temporary bearings were replaced with permanent (ordinary) bearings
Scope of work:
2x T15 Strand Jack
Construction period:
2017