Incremental launching of steel bridge crossing Tunaån, Sweden (Sub-Transfer)

Incremental launching of steel bridge crossing Tunaån

The bridge length was 96 m, with a girder weight of approximately 92 tons. Total launched weight was estimated at 240 tons including formwork.

The launch system was prepared with 6 nos T15-S-18 jacks. After about 2 m of launching, the bridge entered a downward slope. Two jacks were used for braking.

Location:
Tunaån, Sweden

Bridge data:  
Weight: 240 tons
Lenght: 92 m

Scope of work:
6 + 2x T15 Strand Jack

Construction period:
2018