Donghae Port Tri-level Development (Section 2), Korea (Sub-Slipform Gantry)

Donghae Port Tri-level Development (Section 2) – Korea

Donghae Port Tri-level Development project ran between 2020 to 2022. The production of the caissons was carried out using our gantry slipform– and transfer system.

Location:
Donghae, Korea

Caisson
weight:  

11 300 tons

Scope of work:
Gantry Slipform + IP-CCV Skidding System

Total
number of caissons:

27

Construction period:
2020-2022