We are pleased to reveal our newly designed website. Our new website is multilingual (EN, SV & KO), more agile, interactive, and is easier to read and navigate.Read More
Buildings are reaching new heights and arenas are getting bigger as new tech is coming along. Making sure the base structure of buildings and skyscrapers is strong, is the key of successfully constructing them. This is not an easy task and thus it needs expert supervision which can only be obtained from people who have...Read More
The first caisson, out of the 44 Nos to be constructed, was last week successfully slipformed at the Djen djen site in Algeria. The project will last until the summer of 2016.Read More
Engineering and construction go hand in hand and are closely knit for the whole project to run smoothly and be successful. With huge structures the main thing is to be able to lift huge material in weight as well as height. At Bygging-Uddemann, this technique has been mastered with the help of the using jacks...Read More
Step 2 of project “Hålogalandsbrua” is completed. The first of the two pylons now has reched the height of 151 meters. Narvik, Norway. Client: Interform / NCCRead More
Preparation work in progress for lowering of pipline in Norsborg, Stockholm. The operation will be handled by our T15 climber-system. Client: SVENTABRead More
Our first slipform rig for project “Hålogalandsbrua” has reached the height of 141 meters above the sea level. The pylon-“legs” are now to be combined. Rebuilding of the rig is taking place at ground level. Step 2 countinous up to 151 meters. Narvik, Norway. Client: Interform / NCCRead More
Our first slipform rig for project “Hålogalandsbrua” has reached the height of 141 meters above the sea level. The pylon-“legs” are now to be combined. Rebuilding of the rig is taking place at ground level. Step 2 countinous up to 151 meters. Narvik, Norway. Client: Interform / NCCRead More
Our suspension bridge project outside Narvik, Norway, “Hålogolandsbrua” is taking shape. When completed, the lenght of the bridge will be 1533 meters and the pylons rise 170 meters above the sea level. Hålogolandsbrua will then be the second longest suspension bridge in Norway. Client: Interform / NCCRead More
Yesterday, lifting action started of our slipform rig at Messaure water power plant. Our mission is to complete the 70 m deep shaft between the electrical substation of power plant and soil surface.Read More